Prices

  • Setups

    Standard Electric Setup (Hardtail)from $79
    • Relief • Action • Intonation • Pickup height • Electronics check

    Standard Bass Setup (Hardtail)from $79
    • Relief • Action • Intonation • Stability & feel
    Strings sold separately

    Tremolo Setup (Non-Locking)from $95
    • Balanced spring tension • Stable return to pitch

    Tremolo Setup (Locking Systems)from $115
    • Floyd Rose & double-locking systems • Precision setup

    Acoustic Setupfrom $89
    • Comfort-focused • Tone preserved

  • Wiring & Electronics

    Electronics Diagnosis / Bench Feefrom $50
    (Credited toward approved repair)

    Pickup Install (Passive)from $60
    Pickup Install (Active / Complex)from $90
    Pot / Switch / Jack Replacementfrom $45 (per component)
    Complete Re-Wirefrom $90
    Control Cavity Shieldingfrom $30

  • Harware

    Tuner Install (Set)from $55
    Bridge Install (Hardtail / TOM)from $70
    Tremolo Swap (Non-Locking)from $95
    Pickguard Swapfrom $35
    Strap Buttons / Strap Locksfrom $25

  • Nut Services

    NUT SERVICES

    Nut Slot Touch-Up
    • Per slot — from $15
    • Full nut — from $60

    Pre-Slotted Nut Installationfrom $75
    (Graph Tech, Allparts, StewMac, etc.)

    Custom Hand-Cut Nutfrom $125
    • Cut from blank • Slotted & shaped by hand

    Nut material priced separately

  • REFRETS & FRETWORK

    Fret End Dressingfrom $95
    Level, Crown & Polishfrom $175

    Partial RefretInspection required
    Full Refret (Unbound)from $399
    Full Refret (Bound)from $479

  • MISCELLANEOUS

    Truss Rod or Action Adjustmentfrom $30
    Intonation Onlyfrom $35
    Pickup Height Adjustmentfrom $25

    Acoustic Saddle Adjustmentfrom $45
    New Saddle Fit (Labor)from $85

    String Changes
    • Electric — from $30
    • Acoustic — from $30
    • Bass — from $35
    Strings not included

  • SERVICES NOT OFFERED

    Headstock repairs · Structural repairs · Neck resets
    Refinishing or cosmetic restoration

  • TURNAROUND

    Turnaround times vary by workload.
    Our goal is to keep wait times under two weeks during peak periods.